sched/topology: Fix building of overlapping sched-groups
authorPeter Zijlstra <peterz@infradead.org>
Fri, 14 Apr 2017 15:24:02 +0000 (17:24 +0200)
committerIngo Molnar <mingo@kernel.org>
Mon, 15 May 2017 08:15:23 +0000 (10:15 +0200)
When building the overlapping groups, we very obviously should start
with the previous domain of _this_ @cpu, not CPU-0.

This can be readily demonstrated with a topology like:

  node   0   1   2   3
    0:  10  20  30  20
    1:  20  10  20  30
    2:  30  20  10  20
    3:  20  30  20  10

Where (for example) CPU1 ends up generating the following nonsensical groups:

  [] CPU1 attaching sched-domain:
  []  domain 0: span 0-2 level NUMA
  []   groups: 1 2 0
  []   domain 1: span 0-3 level NUMA
  []    groups: 1-3 (cpu_capacity = 3072) 0-1,3 (cpu_capacity = 3072)

Where the fact that domain 1 doesn't include a group with span 0-2 is
the obvious fail.

With patch this looks like:

  [] CPU1 attaching sched-domain:
  []  domain 0: span 0-2 level NUMA
  []   groups: 1 0 2
  []   domain 1: span 0-3 level NUMA
  []    groups: 0-2 (cpu_capacity = 3072) 0,2-3 (cpu_capacity = 3072)

Debugged-by: Lauro Ramos Venancio <lvenanci@redhat.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Mike Galbraith <efault@gmx.de>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Cc: linux-kernel@vger.kernel.org
Cc: stable@vger.kernel.org
Fixes: e3589f6c81e4 ("sched: Allow for overlapping sched_domain spans")
Signed-off-by: Ingo Molnar <mingo@kernel.org>
kernel/sched/topology.c

index d786d45c44d9132abbd42c28904ccf8b2b6e1a02..921dedde2ee1d613b3e2c3d38b0ff5a8e5ddd7c8 100644 (file)
@@ -566,7 +566,7 @@ build_overlap_sched_groups(struct sched_domain *sd, int cpu)
 
        cpumask_clear(covered);
 
-       for_each_cpu(i, span) {
+       for_each_cpu_wrap(i, span, cpu) {
                struct cpumask *sg_span;
 
                if (cpumask_test_cpu(i, covered))