sched/cpufreq: Use the DEADLINE utilization signal
SCHED_DEADLINE tracks active utilization signal with a per dl_rq
variable named running_bw.
Make use of that to drive CPU frequency selection: add up FAIR and
DEADLINE contribution to get the required CPU capacity to handle both
requirements (while RT still selects max frequency).
Co-authored-by: Claudio Scordino <claudio@evidence.eu.com>
Signed-off-by: Juri Lelli <juri.lelli@arm.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Acked-by: Viresh Kumar <viresh.kumar@linaro.org>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Luca Abeni <luca.abeni@santannapisa.it>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Rafael J . Wysocki <rafael.j.wysocki@intel.com>
Cc: Thomas Gleixner <tglx@linutronix.de>
Cc: alessio.balsini@arm.com
Cc: bristot@redhat.com
Cc: dietmar.eggemann@arm.com
Cc: joelaf@google.com
Cc: juri.lelli@redhat.com
Cc: mathieu.poirier@linaro.org
Cc: morten.rasmussen@arm.com
Cc: patrick.bellasi@arm.com
Cc: rjw@rjwysocki.net
Cc: rostedt@goodmis.org
Cc: tkjos@android.com
Cc: tommaso.cucinotta@santannapisa.it
Cc: vincent.guittot@linaro.org
Link: http://lkml.kernel.org/r/20171204102325.5110-2-juri.lelli@redhat.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>