[PATCH] sched: fix newly idle load balance in case of SMT
authorSuresh Siddha <suresh.b.siddha@intel.com>
Thu, 19 Jul 2007 19:28:35 +0000 (21:28 +0200)
committerIngo Molnar <mingo@elte.hu>
Thu, 19 Jul 2007 19:28:35 +0000 (21:28 +0200)
commit9439aab8dbc33c2c03c3a19dba267360383ba38c
treeb6405b709b7bf60216290f9d81aec133faea6adf
parentc41917df8a1adde34864116ce2231a7fe308d2ff
[PATCH] sched: fix newly idle load balance in case of SMT

In the presence of SMT, newly idle balance was never happening for
multi-core and SMP domains (even when both the logical siblings are
idle).

If thread 0 is already idle and when thread 1 is about to go to idle,
newly idle load balance always think that one of the threads is not idle
and skips doing the newly idle load balance for multi-core and SMP
domains.

This is because of the idle_cpu() macro, which checks if the current
process on a cpu is an idle process. But this is not the case for the
thread doing the load_balance_newidle().

Fix this by using runqueue's nr_running field instead of idle_cpu(). And
also skip the logic of 'only one idle cpu in the group will be doing
load balancing' during newly idle case.

Signed-off-by: Suresh Siddha <suresh.b.siddha@intel.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
kernel/sched.c