Bluetooth: Handle physical link completion
Several different actions may be taken when an AMP physical link
becomes available. A channel being created on an AMP controller must
continue the connection process. A channel being moved needs to
either send a move request or a move response. A failed physical link
will revert to using a BR/EDR controller if possible.
Signed-off-by: Mat Martineau <mathewm@codeaurora.org>
Acked-by: Marcel Holtmann <marcel@holtmann.org>
Acked-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Signed-off-by: Gustavo Padovan <gustavo.padovan@collabora.co.uk>