net: use loopback dev when generating blackhole route
Existing ipv4/6_blackhole_route() code generates a blackhole route
with dst->dev pointing to the passed in dst->dev.
It is not necessary to hold reference to the passed in dst->dev
because the packets going through this route are dropped anyway.
A loopback interface is good enough so that we don't need to worry about
releasing this dst->dev when this dev is going down.
Signed-off-by: Wei Wang <weiwan@google.com>
Acked-by: Martin KaFai Lau <kafai@fb.com>
Signed-off-by: David S. Miller <davem@davemloft.net>